135-EDT Hybrid Tunnel System
| 135-EDT Required Support Equipment |
|---|
| Required Chemical Stations 3-Panel Chemical Concierge Dispensing System with VFD Booster Pump. |
| Required Pump Stations (1) H-25 Dual and (1) H-25 Single High-Pressure Pumping Stations. Waterfall Pump Station. |
| Required Hydraulic Power Packs (1) Twin 10hp, (3) 7.5HP, (3) 5HP, and (1) 3HP Hydraulic Power Packs. |
| Required Air Compressors (2) 10HP Vertical 120 Gallon Ingersoll Rand Compressors, and (1) Ingersoll Rand 64 CFM Air Dryer. |
| Required Control Systems (1) Motor Control Center, (1) Photo Eye Entrance System, (2) Entrance Tape Switches, (1) Conveyor Pulse Kit. |